Methods, assumptions and sources
Every number in this tool comes from a public source or a stated assumption on this page. Western Power publishes spare capacity in bands, and NCMT gives bands only; Western Power's TSP Appendix E gives exact utilisation for the most loaded (about 60) zone substations, which this tool uses where it exists. Elsewhere we say "needs ~X MW in an area with <5 MVA spare".
Headroom plan: TSP 2025 | Draft TSP 2026
Western Power published its Draft Transmission System Plan 2026 in October 2026 (consultation closes 12 Nov 2026). The default stays on the published TSP 2025 Appendix E, because the draft can still change. The toggle re-scores and re-ranks every lead in your browser from data exported under both plans; nothing is fetched. With the draft on, every score, rank, band and badge that changes carries a draft 2026 tag. Lead cards and substation popups always show headroom side by side (2025 | draft 2026); where the draft moves a 2029 band, the draft band is shown first, labelled "draft 2026", with the 2025 band beside it, even while scoring stays on TSP 2025.
- 67 lead scores and 122 ranks change under the draft; 0 leads enter and 0 leave the top 10; 0 enter and 0 leave the sweet spot (this tool's screen).
- Enter the top 10 under the draft: none
- Leave the top 10 under the draft: none
- Drop out under the draft (their supply area is no longer constrained): Helena Precinct, Unnamed residential land, Movida Estate, Orchard Private Estate, Robinson Grove, New Junction, Rivermark
- The two pins keep their order under both plans (checked): 1 Former market garden, Stakehill Rd, Karnup; 2 Wandi town-centre site, Anketell Rd. WATCH: Peelhurst Estate, Golden Bay; Leslie St rural lots, Southern River; Hilbert Park estate balance, Hilbert; MKSEA Precinct 3A industrial land, Kenwick; Central Park TOD balance land, Greenfields.
- Alerts in constrained areas: 408 under TSP 2025, 400 under the draft. 25 zone substations have a different 2029 band in the draft and are flagged "band moved under draft" (for example Medina, which serves Wandi, goes from 5–10 to under 5 MVA).
- Constrained substations in 2029: 91 (TSP 2025) vs 90 (draft); severe: 44 vs 43.
Over-capacity as utilisation
Where forecast load exceeds planning capacity (NCR / N-1 as applicable) we show utilisation, for example "117% of planning capacity in 2029", with 0 MVA headroom, never a negative MVA (headroom = planning capacity × (1 − utilisation), floored at 0).
What you see by default
The default view shows the two pins (1 Former market garden, Stakehill Rd, Karnup; 2 Wandi town-centre site, Anketell Rd), then the WATCH tier (Peelhurst Estate, Golden Bay; Leslie St rural lots, Southern River; Hilbert Park estate balance, Hilbert; MKSEA Precinct 3A industrial land, Kenwick; Central Park TOD balance land, Greenfields), and only hand-checked alerts. The sweet-spot count in the header is exactly these leads (the build fails if it does not reconcile under either plan). Leads the second source check could not resolve are not counted: they sit in a collapsed Unresolved (not yet checked enough to count) group under Fresh leads, each marked 'screened only, not hand-checked'. Every inferred lead and alert (substation taken from the map polygon, figures from a team calculation) sits behind the Unverified signals toggle, which is off by default; the count of hidden signals is always shown. Being near a Zenith project, having a big developer (Satterley, DevelopmentWA, Peet, Stockland, Cedar Woods, Frasers) or already selling does not rule a development out: these are tags, and those developments stay in the Grid outlook for every development view with one plain verdict each (tool estimate). Only rows that do not fit the aims (infill, apartments or brownfield, built out or sold out, the operating village, the airport precinct, too-large data centres) are in the Not a microgrid lead tab with their reason. Nothing is deleted. Alerts with no street address or geometry are listed but never pinned on a map ("not mapped: no address"). Peelhurst Estate (Sawley Close) is a WATCH item: its plan says there is sufficient capacity with no off-site headwork upgrades (SPN/2433 p.41: 0.70 MVA needed, Meadow Springs catchment) and the developer FAQ says power 'can readily be extended' from the existing network.
Alert quality filters
Quality filters (from a manual review of 10 alerts, 7 false positives): 446 alerts before, 408 after. Dropped: Gazette admin and revocation notices 2 · region-scheme changes under 5 ha 2 · EPBC referrals with no referral date (already decided; held back until dated new referrals exist) 28 · sand / gravel / extractive 3 · existing licensed estate microgrid project (not a lead) 3. Demoted (kept in the feed, not severe, not in Who to ring): 189 with no published size, 43 under about 0.5 MVA. Severe after filters: 105.
Featured sites
1 Former market garden, Stakehill Rd, Karnup (SPN/2297, 420 lots): Meadow Springs: Western Power said needed by 2026/27; the draft 2026 plan still shows it at Initiation for FY2029, over capacity to 2029 (draft 2026: 110/114/119% in 2027–29). Load ~2.19 MW whole plan (ESTIMATE; no stage size published). The landowner is not confirmed (title not checked). A separate DevelopmentWA/Mirvac Karnup project is in the same suburb. 2 Wandi town-centre site, Anketell Rd (SPN/2375): about 3.4–4.0 MW whole plan (ESTIMATE), first stage about 2.2 MVA (2.09 MW, ESTIMATE) on Medina; owners Denkey Pty Ltd (22.96 ha) and Anketell Holdings Pty Ltd (7.34 ha, under offer via Colliers), final developer unknown. The plan's engineers expect power not to be an impediment, and the tool assumes no upgrade there, so the wait is the connection time only; under the draft 2026 plan Medina drops under 5 MVA in 2029. WATCH: Peelhurst Estate, Golden Bay (Sawley Close Structure Plan, 142 lots; the plan estimates 0.70 MVA, about 0.67 MW at power factor 0.95, ESTIMATE; the plan says no off-site upgrades are needed, so the tool assumes the connection time only) and Leslie St rural lots, Southern River (117 lots, about 0.6 MW, ESTIMATE): both below 1 MW, so only viable combined with neighbours.
Timing rule for new events
A trigger scores +10 only if it is a new plan or rezoning step within 12 months (to 19 Oct 2026) and is counted once per lead. The MRS 1461/23 Gazette notice (9 Oct 2026) is the gazettal of the same urban-deferment resolution already scored for North Ellenbrook West, so it scores once (+10), not twice; North Ellenbrook West is now a weak pass, so it is not a pin either way. Alkimos Central Amendment 4 (consultation from 17 Sep 2026) amends an existing plan, so like every amendment it is shown as information and scores 0.
1. Matching a site to the grid
Each site is placed in the Western Power NCMT supply-area polygon that contains it (point-in-polygon). The polygon gives the capacity band at the site's location. A site's supply zone substation is named only where a planning or application document states it (cited on the lead); otherwise it is shown as unconfirmed. Distance to the nearest 132/330 kV line comes from Western Power's transmission line layer.
2. Time-to-power gap
gap = realistic grid-ready date − the date the customer needs power, always shown as a range (low–high).
| Item | Rule | Source |
|---|---|---|
| power factor | MVA = MW / 0.95 (assumed power factor) | assumption |
| connection time, under 10 MVA | Loads under 10 MVA: 549 days = average time to connect new commercial and industrial customers, FY2024–25 (WA Parliament QoN 2290, answered 10 Jun 2026). A connection time, not a queue. | WA Parliament, Question on Notice 2290 |
| queuing time, 10 MVA or more | Loads of 10 MVA or more (this tool's threshold): 31.2 months = ERA 'overall average queuing time': 36.9 months (Sep 2024), 31.2 (Mar 2025), 31.2 (Sep 2025), i.e. plateaued. ERA's figure covers large customers including generators. | ERA, Western Power AA6 review: framework and approach issues paper (fn 16), https://www.erawa.com.au/sites/default/files/western-power-aa6-review-framework-and-approach-issues-paper.PDF |
| queue spread | Queue figures are averages; the high end of every grid-ready range adds 6 months schedule risk | assumption |
| augmentation | Distribution loads (under 10 MVA): if the stage MVA is above the band bound, add 24 (optimistic, upper bound) to 30 (conservative, lower bound) months. Where the TSP shows the substation over 100% of planning capacity in the need year, the tool uses the upgrade-time range rather than the capacity band to estimate when grid power arrives. Loads of 10 MVA or more and transmission: the optimistic end is the 31.2-month average alone; only the conservative end adds 30 months. A Western Power NOM 'Required by Date (subject to change)' is a need date, not a delivery date, so it never shortens the allowance; only a TSP Appendix E action at Execution stage (E) with a target year, for a substation a source names, shortens it (+6 months slip). | 24–30 months: Centurion / ARENA case (unverified in this build); ERA; Western Power NOM 2025 and TSP Appendix E |
| connection scale | distribution = stage-1 under 10 MVA (zone-substation headroom is the right test); transmission = 100 MW or more (this tool's convention; needs its own 132/330 kV substation, zone-substation headroom is not the test); in between = intermediate (dedicated feeder or sub-transmission) | Western Power distribution threshold; market-scale convention |
| need date | need date = stated operation date if published; ULDO pipeline records use the ULDO 2023-24 Tables (published Jun 2025) financial-year bands: short term (FY2023/24–2027/28) = by Jun 2028 at the latest, medium term (FY2028/29–2032/33) = from Jul 2028, long term (FY2033/34+) = from Jul 2033; an endorsed structure plan with no subdivision yet = today + 24 months; otherwise today + 9 months (under construction), +18 (DA approved) or +24 (DA lodged / proposed / unknown). All defaults are assumptions. | assumption |
| first stage | Stage-1 MW = first building / phase if published; data centres otherwise 25% of nameplate (hall-by-hall ramp); other loads 100% | assumption |
| application lead time | A customer applies for connection about 18 months before it needs power (or today, if that is already past); the queue and any upgrade start then | assumption |
| microgrid could be ready (tool assumption) | Microgrid could be ready (tool assumption): 12–18 months for a stage under 5 MW; about 24 months for larger projects (Zenith MD Hamish Moffat, Energy Magazine, 28 Jul 2026: 'deliver large-scale projects within two years', said of large data-centre projects). | https://www.energymagazine.com.au/going-off-grid-to-power-data-centres-is-this-the-answer-weve-been-looking-for/ |
| window rule | Window open = gap > 0 and the need date is at least 12 months away (time to build a microgrid). Tight = gap > 0 but power needed within 12 months. | assumption |
| band bounds | NCMT publishes spare capacity as bands, so the gap is a range: the optimistic end tests the stage MVA against the band UPPER bound, the conservative end against the LOWER bound (0 for <5 MVA). Headroom is a planning forecast (PoE10), not a connection offer. Whether NCMT includes Western Power's planned works is not verified in this build; NOM projects are a cross-check only. | Western Power NCMT method notes; modelling choice |
| critical projects | Western Power gives connection-ready projects designated under its Critical Projects Framework (launched May 2024) 'right of way to Western Power resources'. Our assumption: projects not designated critical may wait longer than the average connection time, so our grid-ready dates may be optimistic. | Western Power, Critical Projects Framework page (checked 21 Oct 2026) |
3. MW confidence ladder and estimate rules
Badges: H stated in an official document · M stated by media or the proponent · L inferred, derived or typical-for-class estimate.
| Use | Rule | Basis |
|---|---|---|
| Data centre (gross floor area) | about 2,294 W per m² GFA (one sourced calibration point) | CDC Maddington: 145 MW data centre facility (Metro Outer DAP agenda no.102, p.154) on 63,210 m² total warehouse GFA (agenda p.9) = ~2,294 W/m² |
| Data centre (site area) | 10-19 MW per site hectare | STACK Perth campus 24 MW on 2.2 ha (Data Center Map) to CDC Maddington 145MW on 7.6 ha (DAP agenda no.102, pp.9, 154) |
| Industrial / commercial land (net ha of the next stage) | 0.20 MVA per net ha of the next stage = design load (about 0.19 MW at power factor 0.95, ESTIMATE) | Western Power Underground Distribution Schemes Manual, 12th ed., cl. 5.3.3.3 (200 kVA/ha minimum for commercial and light industrial estates, net lot area). A design minimum, not metered demand. Gross ULDO hectares are converted to net at 0.77 (assumption, Muchea 896 net of 1,167 gross ha). |
| Residential or mixed-use land given only in hectares | 0.10-0.14 MVA per ha (base 0.12) | 4.5-6.5 kVA per home at about 21 lots per ha (assumption) |
| Residential estate (homes or lots) | 4.5-6.5 kVA per home, base case 5.5 kVA (5.2 kW at power factor 0.95) | Joint Supply and Planning Manual (STNW3470, Release 8, 7 May 2025) Table 24 (4.5 kVA) to Endeavour Energy TB 0188A (6.5 kVA). Western Power publishes no single per-lot figure (it uses its DADMD calculator). |
| Warehouse / logistics DA (per approved DA) | 0.3-1.0 MW per DA | Assumption for ambient warehouses with offices; cold stores are much higher |
| Approvals Watcher and Precinct Screener: land given only in gross hectares | 0.0365 MW per gross ha | EV-Energy's public application to the ERA to amend ERL33/EDL10 (EV-Energy is a Zenith Energy subsidiary), pp.5, 8: 12 MW peak over 329 ha (Muchea 140 ha, Busselton Airport 165 ha, Busselton Home HQ 24 ha). An observed/expected-peak proxy, about 4× below the UDS Manual 0.20 MVA per net ha design minimum (Muchea alone sizes to 15.2 MW (ESTIMATE) on 0.20 MVA/net ha against 12 MW for all three estates). The 0.20 MVA/net ha rule wins for scoring and sizing; the area proxy is shown only as a lower cross-check. |
4. Sweet-spot test (this tool's screen), constraint rule and fit score
Sweet-spot test (this tool's screen) = connection under 10 MW on the load tested, load about 5 MW or less (definition; the tests applied are connection and grid draw) and grid draw about 4 MW or less, and the customer is a land developer (or estate land a developer will unlock). Judged on connection and grid draw, not total design load: a microgrid caps grid draw (Peel Business Park runs on a 2.2 MW microgrid today (Zenith Energy Peel project page: 'Capacity 2.2 MW')). Estates are tested on the next stage only; single sites on the full load. Where no connection or draw is published, connection = the load tested (the next-stage or first-stage design load for estates and staged sites; the full single-site load where no first-stage figure exists, labelled "Full load tested") and grid draw = 80% of the load tested (assumption, the ratio implied by 4 MW draw on a 5 MW load). (screening thresholds used by this tool)
Constraint rule. Constrained = Western Power NCMT remaining capacity of 20 MVA or less in 2029 (this tool's screening rule: augmentation likely to be needed); severe = under 5 MVA. Headroom is the filter, not the trigger: the trigger is a land purchase, rezoning, structure plan or release. (Western Power Network Capacity Mapping Tool)
The sweet-spot filter (this tool's screen; on by default) shows only leads that pass all three size tests, have a developer as the customer, sit in a constrained 2029 area and are still active. Oversized leads (data-centre campuses, the Alkimos desalination plant, estates whose first stage is 10 MW or more) move to the 'Too big / grid-stretch' tab. Standalone 10–100 MW loads score low unless they sit inside a developer estate; anything over 100 MW is capped at 50.
Sweet-spot screen
- Sweet-spot screen (this tool's screening rule): a lead is out of the sweet spot if its development stage is selling or built-out, if it is apartments, or if it is infill with many owners; and if its whole-plan load is under 1 MW (ESTIMATE allowed; this tool's screening threshold), it is shown only as WATCH, labelled 'below 1 MW: only viable combined with neighbours'.
- The 'Fresh early-stage leads' filter shows the 2 leads and the watch leads only.
Tags vs exclusions
- Being near a Zenith project, having a big developer or already selling is a tag, not an exclusion: those developments stay in the grid outlook.
- Only rows that genuinely do not fit (infill, apartments or brownfield, built out or sold out, the operating village, the airport precinct, too-large data centres) move to the 'Not a microgrid lead' tab with their reason; nothing is deleted.
- Big developer, Already selling, Near a Zenith project and In trade press are tags shown in the grid outlook, not reasons to drop a development; 'Not a microgrid lead' is used only for infill or apartments, estates built out or sold out with no stages left, the operating village, unnamed multi-owner groups, and airport or too-large sites.
Source check totals
- Checked for each lead: the named developer (with source), the development stage (idea, structure plan, approved, subdivision, civil works, selling or built out), press coverage (with links), whether the developer is DevelopmentWA or a tier-1 developer (by public role only) and the site type (greenfield, infill, apartments or industrial).
- Where the source check did not cover a lead, the field says 'unknown'.
- Source check of named developments (21 Oct 2026, three passes, the last a re-check of sites near Zenith projects): 141 developments checked:
- 82 tagged in total (rows marked tagged in the source check), of which 80 are in the TSP 2025 grid outlook and 77 in the draft TSP 2026 one (the others have no load figure, are context rows or are outside a constrained area on that plan)
- 38 in the grid outlook only, main reason Already selling
- 36 in the grid outlook only, main reason Big developer
- 20 unresolved (listed in a collapsed group, not counted)
- 19 not a microgrid lead, Infill, apartments or brownfield
- 5 not a microgrid lead, Built out or sold out
- 5 watch lead
- 3 not a microgrid lead, Nearing completion (no stages left)
- 2 lead
- 2 not a microgrid lead, Too large
- 1 not a microgrid lead, No homes left (ULDO)
- 1 not a microgrid lead, Operating lifestyle village
- 1 not a microgrid lead, Perth Airport precinct
- The other grid-outlook-only developments, main reason Near a Zenith project (see the tag count under Manual tags)
- The last pass made Central Park a watch lead, moved 17 developments to the grid outlook only and marked 3 as not a microgrid lead (2 sold out, 1 with no homes left).
Reconciliation (TSP 2025)
| Count | Step |
|---|---|
| 193 | sweet-spot leads before the screen |
| 30 | not a microgrid lead (source check) |
| 80 | of the 82 tagged in the source check (in the grid outlook, not fresh) |
| 20 | unresolved (not counted) |
| 0 | selling or built-out |
| 28 | apartments |
| 0 | infill with many owners |
| 30 | below 1 MW whole plan |
| 5 | remain |
- On screen (TSP 2025): 7 sweet-spot leads = 2 leads + 5 watch (2 of them below 1 MW), i.e. the 5 that remain after the screen plus the 2 watch leads below 1 MW (counted in the 30 below 1 MW above and still shown as WATCH); 20 unresolved shown separately.
- All rows (TSP 2025): the 193 sweet-spot leads before the screen, plus 50 rows never in the sweet spot (18 too big, 2 data-centre rows (Not a microgrid lead), 24 untagged grid-outlook rows, 6 other) = 243 rows in all tabs.
Grid outlook verdicts
- Grid outlook for every development: one verdict per development from the timeline estimate (tool estimate).
- Where no planning document names the supply substation, the verdict is based on the capacity map band at the site; substation not confirmed.
Near a Zenith project rule
- Near a Zenith project: within a straight-line distance of a publicly reported Zenith project. The distance is 5 km in Perth/Peel, 10 km for regional towns and 50 km for remote and mine sites, set from the typical spacing of neighbouring estates or sites in each area. Metro locations are locality points and may be 1–3 km out. This is a tag for context only. It does not exclude a development or say whether Zenith knows it.
Manual tags
- Manual tags: where a locality or precinct point misplaces a project, the 'Near a Zenith project' tag is added by hand with a sourced note (currently 1: Muchea industrial precinct).
- Near a Zenith project tags: 11 on TSP 2025 (10 by distance and 1 by hand) and 11 on the draft 2026 plan (10 by distance and 1 by hand).
Glossary
- NCMT = Western Power's Network Capacity Mapping Tool
- PoE10 = 10% probability of exceedance (a demand forecast expected to be exceeded one year in ten)
- NOM = Western Power's Network Opportunity Map
- DADMD = Design After Diversity Maximum Demand (Western Power's per-dwelling design demand for a subdivision)
Sizing (design load, not metered demand). Industrial and commercial land: 0.20 MVA per net hectare of the next stage only (Western Power Underground Distribution Schemes Manual, 12th ed., cl. 5.3.3.3 (200 kVA/ha minimum for commercial and industrial lots, net lot area)), labelled "design load". Gross ULDO hectares are converted to net at 0.77 (assumption: Muchea, 896 net of 1,167 gross ha). Where no next-stage area is published the design load shows as pending and the size tests are skipped, not failed. Residential: 4.5–6.5 kVA per home, base case 5.5 kVA (Joint Supply and Planning Manual (STNW3470, Release 8, 7 May 2025), Table 24 (4.5 kVA); Endeavour Energy TB 0188A ADMD schedule (6.5 kVA)); both ends are shown. Western Power publishes no single per-lot figure: it sizes estates with its maximum demand (DADMD) calculator. Residential land given only in hectares: 0.10–0.14 MVA per hectare.
Microgrid logic. The fit score (this tool's screen) is judged on the connection and grid draw of the load tested, not total design load: a microgrid caps grid draw (Peel Business Park runs on a 2.2 MW microgrid today (Zenith Energy Peel project page: 'Capacity 2.2 MW')). Published connection or draw figures are used where they exist; otherwise connection = the load tested (the next-stage or first-stage design load for estates and staged sites; the full single-site load where no first-stage figure exists, labelled "Full load tested") and grid draw = 80% of the load tested. Every estimated grid draw is an assumption (screening assumption; actual draw depends on solar/BESS sizing; to be replaced by design studies) and is marked * in the lists.
Headroom edition. Where they differ, Western Power's TSP 2025 Appendix E (Jul 2026), PoE10 (2026–35, headroom = capacity × (1 − utilisation)) wins over older network data (e.g. Muchea about 6.6 MVA in 2029 rather than about 19). It covers 60 zone substations; elsewhere the Western Power NCMT capacity bands (2025 data) are used. Each lead card names the edition used.
Fit score (0–100)
Score = Σ weight × sub-score. Hard excludes: withdrawn, refused, cancelled, dead, idled or study-only projects, existing assets, unlocated sites.
| Sub-score | Weight | Rule |
|---|---|---|
| size | 30 | Load tested (published connection or draw where known; otherwise the next-stage design load for estates, full load for single sites): 1-5 MW = 1.0; 0.3-1 MW = 0.7; 5-10 MW = 0.6; under 0.3 MW = 0.4; 10-100 MW = 0.1 for a standalone load (0.3 inside a developer estate); over 100 MW = 0 and the fit is capped at 50 ("Transmission / self-build"); unknown = 0.2; design load pending (next-stage area not published) = left out, other weights re-normalised Estates are scored on their first-stage figure because an estate microgrid is built in stages (Peel Business Park started with a 1.2 MW solar farm; DevelopmentWA microgrid FAQ). |
| customer | 25 | land developer (incl. DevelopmentWA and licensed estate microgrids) = 1.0; named residential estate, developer to confirm = 0.9; estate land with the developer not yet identified = 0.6; existing multi-owner precinct = 0.4; single business = 0.3; government infrastructure / utility = 0.1; data-centre operator = 0.1 (0 if it may self-supply); landowner (named in a plan, or not yet confirmed) with an approved plan (developer partner may follow) = 0.8. |
| constraint | 15 | 2029 spare-capacity band at the site (TSP 2025 Appendix E where it lists the substation, else NCMT): under 5 MVA = 1.0; 5-10 = 0.85; 10-15 = 0.7; 15-20 = 0.55; over 20 MVA = 0; outside every NCMT area = 0.2 |
| time-to-power gap | 10 | 0 months = 0; 18 months or more = 1; linear between (midpoint of the gap range) |
| early | 10 | Earlier is better (once building starts it is too late to shape the supply): medium/long-term land = 1.0; short-term land without approval = 0.7; DA lodged, or structure plan endorsed with no subdivision or DA yet = 0.6; subdivision conditionally approved or DA approved = 0.4; existing precinct = 0.3; under construction = 0.2 |
| evidence | 10 | stated MW + confirmed active project = 1.0; stated MW, status unverified = 0.8; derived from documents = 0.6; inferred or typical-for-class = 0.5; locality-level geocode caps at 0.3 |
Site signals (approved additions)
| Signal | Points | Rule |
|---|---|---|
| gas within 1.5 km | 5 | +5 points if the lead is within 1.5 km of a DBNGP or APT Parmelia gas pipeline licence corridor (DMIRS-007). Label: 'gas corridor nearby, a tap needs the pipeline owner's agreement, about 1 yr+'. It marks an option to check, never confirmed supply. |
| gas within 5 km | 2 | +2 points if within 5 km (same label). |
| wetland | -4 | Deliverability penalty, -4 points: the site footprint intersects (estate polygon) or is within 100 m of (point site) a Conservation or Resource Enhancement category wetland (DBCA-019 Geomorphic Wetlands of the Swan Coastal Plain, 2016 data version). |
| contaminated site | -3 | Deliverability penalty, -3 points: footprint intersects or is within 100 m of a DWER-059 contaminated-sites record (any classification). |
| TEC polygon | flag only | Flag only, no penalty: the footprint touches a BCA-listed Threatened Ecological Community polygon (DBCA-038). The public polygons are buffered, so this means 'check with DBCA', not a constraint. |
| location precision | Wetland, contamination and TEC tests run only on street-level, manual or estate-polygon locations. Locality- or LGA-level geocodes and precinct mean points are marked 'not assessed'. The gas distance is computed for every location but labelled approximate for locality-level points. |
Score = Σ weight × sub-score + site-signal points, clamped to 0–100; transmission-scale leads are then capped at 50. Site signals in leads.json (rows with a fit score): rows with a fit score 242 · gas corridor within 1.5 km 60 · gas corridor 1.5–5 km 68 · wetland at the site 58 · contaminated-site record 31 · threatened ecological community (check with DBCA) 73 · not assessed (locality point only) 24.
Stage / timing factor ('call now')
The weighted score rewards fit; this factor rewards timing, so the top of the list is leads that can be acted on now. Points are added on top of the weighted score and site signals, then the total is clamped to 0–100 and rounded half-up (one rounded value, the same in the export and this app). Every flag has a source, shown on the lead card. Calibration sites are scored neutral (0) on this factor: they are scored as if planned today, so their own trigger dates are not comparable.
| Stage flag | Points | Rule |
|---|---|---|
| recent trigger (12 months, pre-construction) | +10 | A dated rezoning, structure-plan endorsement, urban-deferment lift, subdivision approval or stage release within 12 months of today, before construction: +10 |
| no dated trigger found (pipeline record only) | -8 | Estate leads with no dated trigger in the last 12 months (only a land-supply pipeline record, ULDO 2023-24): -8 |
| already selling | -15 | Lots or apartments already on sale: -15 |
| under construction | -15 | Construction under way: -15 |
| mostly built / operating | -25 | Mostly built or already operating: -25 |
| apartments / student beds | -20 | Apartments, multi-dwelling towers or student beds (a builder, not a land unlock): -20 |
| no named developer | -15 | No developer named by a primary source: -15 |
| failed verification | -20 | Failed the lead verification checks (developer, 12-month trigger, not built, not already a licensed estate microgrid): -20 |
| weak pass (verification) | -5 | Passed verification but weak (mid-build or network says capacity is sufficient): -5 |
Sources of flags: published planning and application documents, the verification checks (team verification checks, 19 Oct 2026), and an automatic map match: a WAPC structure plan endorsed (new plans only; amendments to an existing plan earn no points) or an urban region-scheme amendment advertised inside a ULDO estate footprint in the last 12 months. ULDO records with no estate name are flagged 'no named developer'. Leads not checked are labelled inferred.
Source check
Leads are screened for early stage and single-controller land; each pin was checked by hand against public sources.
| Verdict | Lead | Reason (public facts) | Developer / landowner | Stage | Site type | Press |
|---|---|---|---|---|---|---|
| KEEP | Former market garden, Stakehill Rd, Karnup (420 lots) | Early (structure plan approved, no subdivision yet), no trade press found, constrained supply area. | Landowner not confirmed (title not checked). Planner: Element Advisory. source | structure plan | greenfield | none found |
| KEEP | Wandi town-centre site, Anketell Rd (planned shopping centre) | Early (precinct structure plan approved, no DA found), commercial anchor, no trade press found; final developer unknown. | Denkey Pty Ltd (651 Anketell Rd, 22.96 ha) and Anketell Holdings Pty Ltd (727 Anketell Rd, 7.34 ha), together 77.3% of the plan (structure plan title table). Planner: Rowe Group. source | structure plan | greenfield | none found |
| WATCH | MKSEA Precinct 3A industrial land, Kenwick | Industrial land, about 89 ha structure plan (ULDO 24 ha short-term); structure plan amendment approved 9 Dec 2021. Landowner and current stage unknown. | unknown | structure plan | industrial | not checked |
| WATCH | Peelhurst Estate, Golden Bay (Cape Bouvard, 142 lots) | Single owner (Cape Bouvard Developments, owner of all lots per the structure plan, p.23) and early, but small (142 lots; the structure plan estimates 0.70 MVA), and the developer says power can readily be extended from the existing network. | Cape Bouvard Developments Pty Ltd, 'the owner of all lots and all title shares' (structure plan p.23). source | structure plan | greenfield | none found |
| WATCH | Leslie St rural lots, Southern River (117 lots) | Real and early, with a dominant owner, but too small on its own (about 0.6 MW, ESTIMATE). | Auswide International Investments (Southern River) Pty Ltd owns 4 of 5 lots (about 7.7 ha); one lot (1.72 ha) is privately held (structure plan Table 1, p.18). source | structure plan | greenfield | none found |
| WATCH | Central Park TOD balance land, Greenfields (developer unclear) | Early balance land: the earlier stages sold, but ULDO P3 still shows about 820 homes (384 in 6-10 years, 440 later) with no current marketing found (21 Oct 2026). Watch (inferred): owner check needed. | Not established (sources conflict; owner check needed) | unknown | greenfield | local press only |
| WATCH | Hilbert Park estate balance, 9001 Rowley Rd, Hilbert (owner unknown) | Real and sizeable (ULDO SE60: 600 homes in 6-10 years, 400 later). Peet sold the about 67 ha balance by EOI in 2022 and exited by Apr 2023; the buyer and whether it is already selling are unknown without titles. | unknown (buyer of the balance land not established without titles) | structure plan | greenfield | not checked |
| TAGGED | Meridian Park future industrial land, Neerabup (DevelopmentWA; ULDO parcels IND006, 27 ha, and IND003, same estate) | DevelopmentWA land (government land developer). ULDO lists two parcels in this estate (IND006 and IND003); they are one development, shown once. | DevelopmentWA | unknown | industrial | found |
| TAGGED | Crossroads industrial land, Forrestdale (DevelopmentWA per lead data) | Big developer. Proponent is DevelopmentWA per leads.json. Not re-checked online. | unknown | unknown | industrial | not checked |
| TAGGED | Meridian Park Stage 12 industrial lots, Neerabup (DevelopmentWA) | DevelopmentWA estate; lots already titled and selling; in the press. | DevelopmentWA (civil contractor Ertech) source | selling | industrial | found |
| TAGGED | Oldfield Station stage 1, North Ellenbrook (Parcel Property; inferred) | Known tier-1 developers (Parcel Property; Stockland on the amendment); publicly marketed and in government media. | Landowner group holding 91% (DSP); Parcel Property engaged the DSP team; Oldfield Station brand inferred to be the same land source | structure plan | greenfield | found |
| TAGGED | Aarya estate, Piara Waters (Satterley) | Already selling; known developer (Satterley). | Satterley source | selling | greenfield | developer marketing |
| TAGGED | Albero estate, Anketell | Already selling or sold out. Selling (price list marketed by Terranovis). Developer per search: Vestco WA (not confirmed). | unknown | selling | unknown | not checked |
| TAGGED | Alkimos Beach estate (Stockland with DevelopmentWA) | Big developer (Stockland, bought from Lendlease Nov 2024, with DevelopmentWA) and already selling. | Stockland with DevelopmentWA | selling | unknown | not checked |
| TAGGED | Alkimos city centre (DevelopmentWA) | DevelopmentWA land (government land developer). | DevelopmentWA source | structure plan | greenfield | developer pages |
| TAGGED | Alkimos Vista estate, Alkimos | Near a Zenith project. ULDO staging: Medium term, Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Allara estate, Eglinton | Near a Zenith project. ULDO staging: Medium term, Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Amberton estate, Eglinton | Near a Zenith project. ULDO staging: Long term, Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Apsley estate, Mandogalup (QUBE) | Already selling or sold out. QUBE Property Group. About 1,800 lots, selling. The on-screen name misspells 'Apsley'. | QUBE | selling | unknown | not checked |
| TAGGED | Atlantis Beach estate, Two Rocks | Already selling or sold out. Acumen Development Solutions. Selling (Apr 2026 price list); in The West. | unknown | selling | unknown | not checked |
| TAGGED | Austin Lakes estate, South Yunderup (Wolfdene) | Already selling (sales office open, 21 Oct 2026); bought by Wolfdene in 2020 (reported in the AFR). Large future stages remain (Wolfdene: 5,000 lots, 2022-2045). | Wolfdene | selling | unknown | found |
| TAGGED | Ayana estate, Piara Waters (Aigle Royal) | Already selling or sold out. Aigle Royal. Launched 2023, selling. | Aigle Royal | selling | unknown | not checked |
| TAGGED | Baldivis Grove estate (Frasers, sold out) | Big developer. Frasers (tier-1). Sold out. | Frasers | unknown | unknown | not checked |
| TAGGED | Berriman estate, Sinagra/Wanneroo (developer unconfirmed) | Already selling (marketed estate); developer unconfirmed. | developer unconfirmed: the marketed 37-lot estate does not match the ULDO 475 homes source | selling | greenfield | developer marketing |
| TAGGED | Bletchley Park estate, Southern River (Urban Quarter, since 2006) | Already selling since 2006; known developer (Urban Quarter). | Urban Quarter source | selling | greenfield | developer marketing |
| TAGGED | Dandalup Ranges rural-residential estate, North Dandalup (inferred = ULDO Blue Ranges) | Already selling or sold out. Rural-residential lots marketed as 'Dandalup Ranges' (Corrib Developments; the 401 Shanns Rd site sold Apr 2024). Selling. Large lots on many owners: not a microgrid fit. | unknown | selling | unknown | not checked |
| TAGGED | Brabham Estate (Brabham), residential estate | Selling; known developers (Peet with DevelopmentWA). | Peet with DevelopmentWA source | selling | greenfield | developer marketing |
| TAGGED | Brightwood East (Baldivis), residential estate | Already selling; known developer (Parcel Property). | Parcel Property source | selling | greenfield | developer marketing |
| TAGGED | Brookside Waters estate, Champion Lakes | Already selling or sold out. Selling via Vost Property Group. The developer appears to be Noble Hodge (MGC Civil case study). | unknown | selling | unknown | not checked |
| TAGGED | Burns Beach Estate, Burns Beach | Near a Zenith project. ULDO staging: Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Canterfield Estate (Hilbert), residential estate | Already selling; known developer (Arbitrage Projects, per OpenLot). | Arbitrage Projects, per OpenLot source | selling | greenfield | developer marketing |
| TAGGED | Capricorn Beach estate, Yanchep (Acumen) | Already selling (OpenLot); the former Club Capricorn resort site is being redeveloped as housing (in The West). | Acumen Development Solutions | selling | unknown | found |
| TAGGED | Cassia Glades estate, Kwinana (Satterley) | Big developer. Satterley with the Housing Authority; DevelopmentWA lists Cassia. Selling. | Satterley | selling | unknown | not checked |
| TAGGED | Cassia Rise estate, Parmelia (Satterley) | Big developer. Satterley with the Housing Authority. Selling. | Satterley | selling | unknown | not checked |
| TAGGED | Catalina estate, Clarkson/Mindarie (Satterley-marketed) | Big developer (Satterley runs the estate site and price list) and already selling: price list updated 14 Oct 2026; Stage 51 due Dec 2026-Feb 2027, Stage 47 Mar-May 2027. | Satterley | selling | unknown | not checked |
| TAGGED | Claravale (Hilbert), residential estate | Already selling; known developer (Parcel Property). | Parcel Property source | selling | greenfield | developer marketing |
| TAGGED | Clementine estate, Upper Swan (Satterley) | Big developer. Satterley. Selling. | Satterley | selling | unknown | not checked |
| TAGGED | East of the Beach estate, Eglinton | Near a Zenith project. ULDO staging: Medium term, Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Everleigh estate, Ravenswood (Watson Property Group) | Already selling: 234 homes at 192 Old Mandurah Rd. ULDO P28A: 177 short-term with conditional approval. | Watson Property Group | selling | unknown | not checked |
| TAGGED | Florence estate, Mandogalup (Satterley) | Big developer. Satterley. Selling. | Satterley | selling | unknown | not checked |
| TAGGED | Garden Park Grove (Sinagra), residential estate | Already selling; known developer (Acumen Development Solutions). | Acumen Development Solutions source | selling | greenfield | developer marketing |
| TAGGED | Glen Iris estate (former golf course), Jandakot | Already selling or sold out. Eastcourt (managed by Acumen). Former golf course; selling. | unknown | selling | unknown | not checked |
| TAGGED | Golden Bay estate (Peet/DevelopmentWA) | Big developer. Peet with DevelopmentWA. About 2,200 homes, award-winning, selling. | Peet/DevelopmentWA | selling | unknown | not checked |
| TAGGED | Golden Fields estate, Nambeelup | Near a Zenith project. ULDO staging: Medium term, Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Greenlea estate, Baldivis (Avon Estates) | Already selling or sold out. Avon Estates. Titles issued and selling (Attree). | Avon Estates | selling | unknown | not checked |
| TAGGED | Hammond West estate, Hammond Park (QUBE) | Already selling or sold out. QUBE. Selling; LDP for stages 8-11A approved Feb 2026. | QUBE | selling | unknown | not checked |
| TAGGED | Harrisdale North estate (Yolk Property) | Already selling or sold out. Yolk Property Group. Selling. | Yolk Property | selling | unknown | not checked |
| TAGGED | Illyarrie (Sinagra), residential estate | Under construction and launched; known developer (Stockland). | Stockland source | civil works | greenfield | developer marketing |
| TAGGED | Jindalee Beachside estate (Heath Development Company) | Already selling (OpenLot, 21 Oct 2026). ULDO NW44: 170 short-term with conditional approval. | Heath Development Company | selling | unknown | not checked |
| TAGGED | Jindee estate, Jindalee (Estates Development Company) | Already selling (sales office open, 21 Oct 2026). ULDO NW45: 502 / 514. | Estates Development Company | selling | unknown | not checked |
| TAGGED | Jindowie estate, Yanchep | Near a Zenith project. ULDO staging: Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Kennedy Bay (Port Kennedy), residential estate | Already selling; known developer (Place Development and Parcel Property). | Place Development and Parcel Property source | selling | greenfield | found |
| TAGGED | Kingsford estate, Bullsbrook (Okeland) | Already selling or sold out. Okeland Communities (formerly Amex). Selling, with town-centre works started. | Okeland | selling | unknown | not checked |
| TAGGED | Kinmore Green estate, Darch (Parcel Property) | Already selling or sold out. Selling estate by Parcel Property (Parcel Darch Pty Ltd), with display homes. Civil stages 2021-24. | Parcel Property | selling | unknown | not checked |
| TAGGED | Lake Treeby estate, Treeby (Perron Group) | Already selling or sold out. Perron Group. Selling, with a display village. | Perron Group | selling | unknown | not checked |
| TAGGED | Lakelands Estate (Lakelands), residential estate | Already selling; known developer (Peet). | Peet source | selling | greenfield | developer marketing |
| TAGGED | Mahala estate, Forrestdale (Satterley/DevelopmentWA) | Selling since Jul 2020; known developers (Satterley with DevelopmentWA). | Satterley with DevelopmentWA source | selling | greenfield | developer marketing |
| TAGGED | Millars Landing estate, Baldivis (Cedar Woods) | Big developer. Cedar Woods. Selling. | Cedar Woods | selling | unknown | not checked |
| TAGGED | Movida estate, Midvale (Peet) | Big developer. Peet (tier-1; Peet Stratton Pty Ltd). About 1,000 homes, selling. | Peet | selling | unknown | not checked |
| TAGGED | Murray River Country Estate, Pinjarra (long-running; current owner unknown) | Already selling: lots created and resold for years. Owner unknown; ~2,670 homes still to come per ULDO (P41: 438 / 581 / 1,652), so a title-check candidate. | unknown (not named publicly) | selling | unknown | not checked |
| TAGGED | Nautic Estate final stage, Two Rocks | Late: final stage (about 320 lots) of a selling estate; subdivision approved, works from Aug 2026. | Fowler Group (majority landowner, per Harley Dykstra) source | selling | greenfield | developer marketing |
| TAGGED | Oakebella estate, Wellard (Satterley/LWP) | Big developer. Satterley with LWP. Stage 9 clearance in Oct 2025; selling. | Satterley/LWP | selling | unknown | not checked |
| TAGGED | Ocean Hill estate, Lakelands (CP Group/Satterley) | Big developer. CP Group, with Satterley as project manager. Selling. | CP Group/Satterley | selling | unknown | not checked |
| TAGGED | Orchard estate, Midvale | Already selling or sold out. Already selling and titled: REIWA records lots sold on Orchard Ave in Jun 2025 and May 2026. Developer UNKNOWN (OpenLot 'N/A'); Abel Property is the agent. | unknown | selling | unknown | not checked |
| TAGGED | Orelia Trails (former Kwinana Education Precinct), Orelia | Big developer. The former Kwinana Education Precinct, up to 150 homes. DevelopmentWA's project page (developer inferred: DevelopmentWA). It has a Local Development Plan. | unknown | unknown | unknown | not checked |
| TAGGED | Paramount Private Estate (Baldivis), residential estate | Already selling; known developer (Spatial Property Group). | Spatial Property Group source | selling | greenfield | developer marketing |
| TAGGED | Parkland Heights (Baldivis), residential estate | Selling; known developer (Summit Homes Group); in The West. | Rockingham Park Pty Ltd (Summit Homes Group) source | selling | greenfield | found |
| TAGGED | Providence estate, Wellard (Eastcourt) | Already selling or sold out. Eastcourt Property Group (Urban Quarter also lists it). Established and selling. | Eastcourt | selling | unknown | not checked |
| TAGGED | Ravenswood neighbourhood centre (Coles mixed-use), Pinjarra Rd / Old Mandurah Rd | Big developer. Coles is named as proponent of the approved mixed-use centre (in the trade press: The Urban Developer). Mostly retail, with some residential above shops; ULDO: 250 homes medium-term plus commercial. | Coles (proponent of the mixed-use centre, per The Urban Developer) | approved | unknown | found |
| TAGGED | Ravenswood Waters estate (Riverland Ramble Pty Ltd) | Already selling (OpenLot lists land and house-and-land, 21 Oct 2026). ULDO P206: 305 homes medium-term. | Riverland Ramble Pty Ltd | selling | unknown | not checked |
| TAGGED | Robinson Grove estate, Bellevue (Satterley) | Big developer. Satterley. About 535 homes, selling. Brownfield (heritage precinct). | Satterley | selling | unknown | not checked |
| TAGGED | Seaside estate, Madora Bay (Satterley) | Already selling; known developer (Satterley). | Satterley source | selling | greenfield | developer marketing |
| TAGGED | Shorehaven estate, Alkimos | Near a Zenith project. ULDO staging: Short term with current conditional approval. | unknown | unknown | unknown | not checked |
| TAGGED | Sienna Wood estate, Hilbert (Stockland/DevelopmentWA) | Big developer. Stockland with DevelopmentWA. 3,800+ homes, selling. | Stockland/DevelopmentWA | selling | unknown | not checked |
| TAGGED | Spires Private Estate (Baldivis), residential estate | Already selling; known developer (Spatial Property Group). | Spatial Property Group source | selling | greenfield | developer marketing |
| TAGGED | Springtime estate, Haynes (Urban Quarter) | Already selling; known developer (Urban Quarter). | Urban Quarter source | selling | greenfield | developer marketing |
| TAGGED | St Leonards estate, Dayton | Already selling or sold out. Progress Developments and Little Group. Selling. | unknown | selling | unknown | not checked |
| TAGGED | Taylor estate, Caversham (Western Corporate) | Already selling or sold out. Western Corporate. About 700 homes, selling since about 2015; in The West. | Western Corporate | selling | unknown | not checked |
| TAGGED | The Avenue estate, Hilbert (Peet) | Big developer. Peet (tier-1). About 900 homes, selling. | Peet | selling | unknown | not checked |
| TAGGED | The Glades estate, Byford (Satterley) | Big developer. Satterley, formerly LWP. Selling since 2006. TBB is the planner. | Satterley | selling | unknown | not checked |
| TAGGED | The Kilns estate (former quarry), Carramar | Already selling or sold out. Marford Group. Former limestone quarry; selling. | unknown | selling | unknown | not checked |
| TAGGED | The Village at Wellard (Peet/DevelopmentWA) | Big developer. Peet with DevelopmentWA, running for 22 years. | Peet/DevelopmentWA | unknown | unknown | not checked |
| TAGGED | Lake Treeby north, Treeby (Perron Group; inferred) | Already selling; developer inferred (Perron Group, Lake Treeby). | Perron Group (inferred: Lake Treeby north section) source | selling | greenfield | developer marketing |
| TAGGED | Trinity estate, Alkimos (Northern Corridor Developments; Satterley-marketed) | Big developer as marketer (Satterley; owner Northern Corridor Developments Ltd) and already selling: Stage 39 online release. | Northern Corridor Developments Ltd (marketer: Satterley) | selling | unknown | not checked |
| TAGGED | Constellar estate, Cardup (Gold Estates) (inferred = ULDO SE619) | Already selling or sold out. ULDO SE619 (1,300 homes) matches the Lot 33 Hopkinson Rd SP (SPN 2345: 1,100-1,300 dwellings, Cardup Investments Pty Ltd / Gold Estates; approved Jun 2024). Marketed as Constellar; Stage 3 release Oct 2026; LDPs Nov 2025. Selling. | unknown | selling | unknown | not checked |
| TAGGED | Vista Private Estate (Karnup), residential estate | Already selling; known developer (Golden Group). | Golden Group source | selling | greenfield | developer marketing |
| TAGGED | Whitby Town estate, Whitby (Golden Group) | Already selling or sold out. Golden Group. About 4,000 homesites, launched and selling. | Golden Group | selling | unknown | not checked |
| TAGGED | Wildflower estate, Piara Waters (Stockland) | Big developer. Stockland (tier-1); Cossill & Webley engineers. Selling; all-electric. | Stockland | selling | unknown | not checked |
| TAGGED | Yanchep Golf Estate (Peet) | Big developer (Peet) and already selling: Stage 11 sales plan dated 20 Apr 2026. | Peet | selling | unknown | not checked |
| UNKNOWN | MKSEA Welshpool Rd industrial land, Wattle Grove | 26 ha ULDO industrial site, short-term. Lead data says 'multiple landholders'. Owner and stage not established. | unknown | unknown | industrial | not checked |
| UNKNOWN | North Pinjarra structure-plan area, Pinjarra | Developer not established. The Shire lists a 'North Pinjarra' structure plan (extension approval). ULDO P185: 211/390/774 homes. A nearby Thomas St LSP site (19 Tuckey St, 317 lots) was offered by EOI (closed 25 Jul 2026), but it is not established as the same land. | unknown | unknown | unknown | not checked |
| UNKNOWN | Anketell: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (SW374, SW375, SW465; staging Medium term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Baldivis: 5 unnamed ULDO land parcels (not one site) | An aggregate of 5 unnamed ULDO records (SW169, SW365, SW372, SW378, SW461; staging Long term, Medium term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Byford: 11 unnamed ULDO land parcels (not one site) | An aggregate of 11 unnamed ULDO records (SE30, SE334, SE449, SE497, SE585, SE586, SE587, SE588, SE610, SE618, SE625; staging Long term, Medium term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Casuarina: 4 unnamed ULDO land parcels (not one site) | An aggregate of 4 unnamed ULDO records (SW366, SW445, SW456, SW467; staging Long term, Medium term, Short term). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Cockburn Central: 4 unnamed ULDO land parcels (not one site) | An aggregate of 4 unnamed ULDO records (SW420, SW457, SW468, SW70; staging Medium term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Darch: 4 unnamed ULDO land parcels (not one site) | An aggregate of 4 unnamed ULDO records (NW347, NW348, NW457, NW463; staging Long term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Hammond Park: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (SW136A, SW136G, SW136H; staging Medium term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Harrisdale: 2 unnamed ULDO land parcels (not one site) | An aggregate of 2 unnamed ULDO records (SE170, SE480; staging Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Haynes: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (SE485, SE533, SE629; staging Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Huntingdale: 2 unnamed ULDO land parcels (not one site) | An aggregate of 2 unnamed ULDO records (SE338, SE601; staging Long term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Maddington: 16 unnamed ULDO land parcels (not one site) | An aggregate of 16 unnamed ULDO records (SE351, SE429, SE436, SE441, SE503, SE504, SE531, SE536, SE563, SE564, SE565, SE566, SE584, SE600, SE613, SE628; staging Long term, Medium term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Maddington: 16 unnamed ULDO land parcels (not one site) (same parcels as the Maddington (Gosnells) record) | An aggregate of 16 unnamed ULDO records (SE351, SE429, SE436, SE441, SE503, SE504, SE531, SE536, SE563, SE564, SE565, SE566, SE584, SE600, SE613, SE628; staging Long term, Medium term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Martin: 1 unnamed ULDO land parcel (ULDO SE487) | An aggregate of 1 unnamed ULDO records (SE487; staging Medium term). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Pinjarra: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (P158, P183, P222; staging Long term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Rockingham: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (SW355, SW427, SW449; staging Long term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Secret Harbour: 3 unnamed ULDO land parcels (not one site) | An aggregate of 3 unnamed ULDO records (SW265, SW35, SW403; staging Long term, Medium term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Southern River: 4 unnamed ULDO land parcels (not one site) | An aggregate of 4 unnamed ULDO records (SE361, SE482, SE591, SE632; staging Long term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| UNKNOWN | Success: 4 unnamed ULDO land parcels (not one site) | An aggregate of 4 unnamed ULDO records (SW237, SW304, SW323, SW359; staging Long term, Medium term, Short term, Short term with current conditional approval). No developer or landowner can be established without titles, so it can't be judged as one site. | unknown | unknown | unknown | not checked |
| DROP | CDC Maddington data centre (Kenwick Rd) | Too large (data centre); approved by the Metro Outer DAP on 10 Sep 2025 and already public. | CDC Data Centres source | approved | industrial | public decision |
| DROP | Pinjarra Industrial Estate (DevelopmentWA) | Built out or sold out. Inferred to be DevelopmentWA's Pinjarra Industrial Estate. Stage 3 sold out, next stage planned. About 11 km from Peel BP. | DevelopmentWA | built-out | industrial | not checked |
| DROP | Airport South (Tonkin Connect) industrial precinct, Perth Airport | Perth Airport precinct. Perth Airport-controlled land in the published Master Plan 2026 (Tonkin Connect, about 203 ha), already developing (Skyfields, Woolworths DC). A major corporate landlord, not a fresh developer lead. | unknown | unknown | industrial | not checked |
| DROP | CDC Hazelmere data centre (Bushmead Rd) | Too large (data centre); in the trade press (Business News, 23 Sep 2026). | CDC Data Centres | unknown | industrial | found |
| DROP | Tuart Lakes lifestyle village (Serenitas), Baldivis | Operating lifestyle village. An existing, operating lifestyle village (land-lease operator Serenitas). The plan completes its final stages (lead note: failed verification). Not early. | unknown | unknown | unknown | not checked |
| DROP | Baldivis Parks estate (Frasers, nearly complete) | Nearly complete (Frasers Property, projected completion 2026; archived developer page, 16 Jun 2025). | Frasers Property with Bonvest source | built-out | greenfield | developer marketing |
| DROP | Brooklands estate, Henley Brook (Progress Developments) | Nearing completion (no stages left). Progress Developments. Nearing completion (Dec 2026). | Progress Developments | built-out | unknown | not checked |
| DROP | Former TV station sites, Dianella (Satterley/HB Land 'Broadcast Hills') | Infill on an established network; known developers (Satterley with HB Land); in the trade press (Business News, Mar 2026). | Satterley (joint venture with HB Land) source | structure plan | infill | found |
| DROP | Former TV station sites, Dianella: Gay St part (Satterley/HB Land 'Broadcast Hills') | Same project as the Cottonwood Cres site: infill, known developers (Satterley with HB Land), in the trade press. | Satterley (joint venture with HB Land) source | structure plan | infill | found |
| DROP | Ellenbrook town (Satterley, sold out) | Built out or sold out. Satterley. The 8 Oct 2026 price list shows no land available; the final release was Nov 2024. | Satterley | built-out | unknown | not checked |
| DROP | Frasers Landing, Coodanup (Frasers, sold out) | Built out or sold out. Residential land sold out (developer site, 21 Oct 2026). | Frasers Property | built-out | unknown | not checked |
| DROP | Garden Towers apartments, East Perth (Finbar, completed) | Completed apartments: titles issued and settlements started (Finbar ASX announcement, 14 Oct 2026). | Finbar Group source | built-out | apartments | found |
| DROP | Harrington Waters estate, Waikiki (Summit) | Nearing completion (no stages left). Summit Homes Group estate launched in 2001; tail end. | Summit | built-out | unknown | not checked |
| DROP | Helena Precinct urban renewal, Midland (DevelopmentWA) | Infill, apartments or brownfield. DevelopmentWA urban-renewal infill. Sites are sold to many builders (e.g. Bluerock BtR; Lots 928/929 offered Oct 2025). | DevelopmentWA | unknown | infill | not checked |
| DROP | Heritage Park estate, Baldivis (sold out) | Sold out (developer website, archived 15 Mar 2025). | Summit Homes Group / Rockingham Park Pty Ltd source | built-out | greenfield | developer marketing |
| DROP | Leighton Beach apartments, North Fremantle | Infill, apartments or brownfield. Coastal apartment infill: DAP005/26 is for 81 multiple dwellings; earlier stages were by Mirvac. | unknown | unknown | apartments | not checked |
| DROP | OneOneFive, Hamilton Hill (DevelopmentWA; former high school site) | Infill, apartments or brownfield. DevelopmentWA. Infill on the former Hamilton Senior High School site. | unknown | unknown | infill | not checked |
| DROP | Swanbourne St precinct (Knutsford), Fremantle | Infill, apartments or brownfield. Brownfield infill: an 8.3 ha former industrial area with many owners (inferred). Structure plan extension requested Apr 2025. Next to DevelopmentWA's Knutsford project. | unknown | unknown | infill | not checked |
| DROP | Beaconsfield: 3 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 3 unnamed ULDO records (Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Beaconsfield: 3 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 3 unnamed ULDO records (Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Burswood: 2 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 2 unnamed ULDO records (Mixed use, Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Como: 8 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 8 unnamed ULDO records (Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Fremantle: 6 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 6 unnamed ULDO records (Mixed use, Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Karrinyup: 1 unnamed ULDO land parcel (ULDO MD846) | Infill, apartments or brownfield. Urban infill: 1 unnamed ULDO records (Mixed use) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Leederville: 4 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 4 unnamed ULDO records (Mixed use, Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Manning: 1 unnamed ULDO land parcel (ULDO IN494) | Infill, apartments or brownfield. Urban infill: 1 unnamed ULDO records (Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Nedlands: 12 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 12 unnamed ULDO records (Commercial, Mixed use, Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Perth: 5 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 5 unnamed ULDO records (Mixed use, Residential, Tourism) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Ravenswood: 1 unnamed ULDO parcel (no homes listed) | No homes left (ULDO): P219 shows 0 homes in every period (2023-24). | unknown | built-out | unknown | not checked |
| DROP | Rivervale: 2 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 2 unnamed ULDO records (Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | South Perth: 2 unnamed ULDO land parcels (not one site) | Infill, apartments or brownfield. Urban infill: 2 unnamed ULDO records (Mixed use, Residential) in an established, already-networked suburb. No developer named, and with several records, owners are presumably many (inferred). | unknown | unknown | infill | not checked |
| DROP | Vertex estate, Yanchep (Satterley, sold out) | Built out or sold out. Sold out (developer site, 21 Oct 2026). | Satterley | built-out | unknown | not checked |
Hand-checked pins
Leads are screened for early stage and single-controller land; each pin was checked by hand against public sources. The two pins passed the verification checks (developer or landowner named by a primary source, dated trigger within 12 months, not already built, not already a licensed estate microgrid (ERA register)) and the source check. WATCH leads are badged, shown under the pins, and are not calls. Zone substations are labelled 'named in plan' only where a planning document names them (Stakehill, Wandi, Peelhurst/Sawley Close, and in the dropped tab North Ellenbrook West and Alkimos); so do the GreenSquareDC Hazelmere DAP agenda (no.141, p.403) and the South Bullsbrook LSP2 (2016, p.83). The approvals cards add Precinct 8 (Wanneroo), Port Kennedy (Waikiki, 2011 study) and Doobarda (Byford). CDC Maddington: no public planning document we opened confirms its supply substation (unconfirmed). Every other site's supply substation is shown as 'unconfirmed'; the NCMT polygon at its location gives only the capacity band.
| Pin | Lead | Status | Sources |
|---|---|---|---|
| 1 | Former market garden, Stakehill Rd, Karnup (420 lots) | hand-checked (Source check (21 Oct 2026): passed) | trigger |
| 2 | Wandi town-centre site, Anketell Rd (planned shopping centre) | hand-checked (Source check (21 Oct 2026): passed) | trigger · trigger · size |
| Peelhurst Estate, Golden Bay (Cape Bouvard, 142 lots) (below 1 MW: only viable combined with neighbours) | watch (Source check (21 Oct 2026): Single owner (Cape Bouvard Developments, owner of all lots per the structure plan, p.23) and early, but small (142 lots; the structure plan estimates 0.70 MVA), and the developer says power can readily be extended from the existing network.) | trigger · trigger · developer · substation | |
| Leslie St rural lots, Southern River (117 lots) (below 1 MW: only viable combined with neighbours) | watch (Source check (21 Oct 2026): Real and early, with a dominant owner, but too small on its own (about 0.6 MW, ESTIMATE).) | trigger · trigger · size | |
| Central Park TOD balance land, Greenfields (developer unclear) | watch (Source check (21 Oct 2026): Early balance land: the earlier stages sold, but ULDO P3 still shows about 820 homes (384 in 6-10 years, 440 later) with no current marketing found (21 Oct 2026). Watch (inferred): owner check needed.) | trigger · stage | |
| Oldfield Station stage 1, North Ellenbrook (Parcel Property; inferred) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Known tier-1 developers (Parcel Property; Stockland on the amendment); publicly marketed and in government media.) | trigger · trigger · trigger · stage | |
| Meridian Park Stage 12 industrial lots, Neerabup (DevelopmentWA) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): DevelopmentWA estate; lots already titled and selling; in the press.) | trigger · trigger · trigger · developer | |
| Hammond Quarter: mid-build | weak pass (PASS (weak: mid-build, network says capacity sufficient)) | trigger | |
| Brooklands estate, Henley Brook (Progress Developments) | dropped (Not a microgrid lead (source check, 21 Oct 2026): Nearing completion (no stages left). Progress Developments. Nearing completion (Dec 2026).) | trigger · trigger · stage · developer | |
| Tuart Lakes lifestyle village (Serenitas), Baldivis | dropped (Not a microgrid lead (source check, 21 Oct 2026): Operating lifestyle village. An existing, operating lifestyle village (land-lease operator Serenitas). The plan completes its final stages (lead note: failed verification). Not early.) | trigger · developer | |
| Ellenbrook town (Satterley, sold out) | dropped (Not a microgrid lead (source check, 21 Oct 2026): Built out or sold out. Satterley. The 8 Oct 2026 price list shows no land available; the final release was Nov 2024.) | developer · substation | |
| Brookside Waters estate, Champion Lakes | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Already selling or sold out. Selling via Vost Property Group. The developer appears to be Noble Hodge (MGC Civil case study).) | stage · size | |
| Kenwick South: old plan | failed | trigger · stage · size | |
| Ravenswood Waters estate (Riverland Ramble Pty Ltd) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Already selling (OpenLot lists land and house-and-land, 21 Oct 2026). ULDO P206: 305 homes medium-term.) | trigger · size | |
| Ravenswood neighbourhood centre (Coles mixed-use), Pinjarra Rd / Old Mandurah Rd | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Big developer. Coles is named as proponent of the approved mixed-use centre (in the trade press: The Urban Developer). Mostly retail, with some residential above shops; ULDO: 250 homes medium-term plus commercial.) | trigger | |
| Peel: excluded: already a licensed estate microgrid (a Zenith Energy company; ERA EDL7). Calibration only. | excluded | trigger | |
| Alkimos city centre (DevelopmentWA) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): DevelopmentWA land (government land developer).) | trigger · trigger · size · developer | |
| Nautic Estate final stage, Two Rocks | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Late: final stage (about 320 lots) of a selling estate; subdivision approved, works from Aug 2026.) | trigger | |
| Ocean Hill estate, Lakelands (CP Group/Satterley) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Big developer. CP Group, with Satterley as project manager. Selling.) | trigger | |
| Crossroads industrial land, Forrestdale (DevelopmentWA per lead data) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Big developer. Proponent is DevelopmentWA per leads.json. Not re-checked online.) | trigger · trigger | |
| Clementine estate, Upper Swan (Satterley) | tagged (In the grid outlook, tagged; not a fresh early-stage lead (source check, 21 Oct 2026): Big developer. Satterley. Selling.) | trigger · trigger · stage |
North Ellenbrook West is now a weak pass, long-horizon watch, not a pin: the district plan (p.86) says the area is currently serviced by the Muchea Zone Substation, about 17 km north, and that a new zone substation is required at build-out; Muchea is not on the draft TSP 2026 highly loaded list. The district plan's "new zone substation required" line comes from a 2018 servicing report (Pritchard Francis, 26 Sep 2018; stale), and the first stage is tied to the Tonkin interchange (about 2028), so "first homes late 2027" is soft. The safe line: a future zone substation at 7,700–8,500 homes. It is shown as its stage 1 only: LSP Area 1, Gateway (South-East), about 120 ha (SWAN-SP/2026/2); the district plan names Muchea (TSP 2025 headroom about 10.2 / 8.7 / 6.6 MVA in 2027 / 2028 / 2029). The stage-1 yield is not public, so about 1,000–1,130 homes is an assumption (120 ha at the district average density), giving 4.5–7.3 MVA at 4.5–6.5 kVA per home. Stage 1 would exceed 10 MVA above about 1,818 homes at 5.5 kVA. At the base case its estimated grid draw (assumption) is just over 4 MW, so it tests as 'edge' rather than core. Trigger: the WAPC resolution of 16 Sep 2026 to lift urban deferment on 325 ha (aggregator source; the Government Gazette notice was not re-opened). Amendment 2 proposes 7,700–8,500 homes for the whole district.
Calibration against licensed estate microgrids (ERA register)
The estate and park microgrids named on distribution licences EDL7, EDL9 and EDL10 in the ERA electricity licence register are scored with exactly the same rules as live leads, as if planned today. They are a calibration check only, not leads, and are not shown in the lead lists or on the map. Industrial estates are sized on the next stage only at 0.20 MVA per net ha (Busselton Airport: the 15 ha precinct being marketed, not re-verified; the ERA licence area there is 165 ha; Busselton Home HQ: 15 ha from EV-Energy's ERA application, whose summary table says 24 ha; Muchea: EV-Energy's ERA application publishes Stage 3 (8 lots pre-sold, first customers Sep 2026) and Stage 4 (18 lots, 2026) but no stage areas, so the about 80 ha still unsold is used as an upper-bound ESTIMATE, giving about 16 MVA design load, over the 10 MW connection limit, so Muchea tests 'over' and sits outside the sweet spot; it fits only if a stage of 25 net ha or less is published (25 × 0.20 = 5 MVA); Peel: Stage 3 hectares are not published, so its design load is pending and it is judged on the 2.2 MW microgrid capacity published by Zenith Energy (project page); DevelopmentWA names Peel Renewable Energy as the long-term operator). Zenith-group rows are disclosed only where a source shows it: Peel (a Zenith Energy company) and the EV-Energy rows (a Zenith Energy subsidiary, per its ERA application); Ocean Reef ownership is not attributed (no source opened shows it). Residential precincts use 5.5 kVA per home (range 4.5–6.5): Ocean Reef Marina on first-stage homes with the published 4 MVA connection; Eglinton Village on the district-centre structure plan dwellings (an assumption to confirm). Rank is the position the site would take among the 173 scored rows (draft: 167): 1 + the number of those rows scoring strictly higher, so sites with nearby scores can share a rank. Calibration sites are neutral on the stage / timing factor (their own triggers are years old), while live leads gain or lose up to +10 / −25 points for timing. Muchea being outside the sweet spot is expected and kept as it is.
| Licensed site (licence) | Fit | Rank among scored rows (TSP 2025) | Connection / grid draw tested | Sweet spot | 2029 band at the site (supply substation) | Register |
|---|---|---|---|---|---|---|
| Peel Business Park, Nambeelup (Peel Renewable Energy, a Zenith Energy company; ERA EDL7) | 91 | #6 of 174 | ~2.2 / 2.2 MW* (published capacity, assumed = draw) (design load pending) | yes | 5-10 MVA (unconfirmed) | ERA register |
| Ocean Reef Marina (Ocean Reef Renewable Energy, EDL9) | 85 | #7 of 174 | ~3.8 MW (ESTIMATE: 4 MVA × 0.95) / 1.8 MW* (design 2.25 MW, ESTIMATE) | yes | <5 MVA (unconfirmed) | ERA register |
| Eglinton Village (EV-Energy, a Zenith Energy subsidiary; EDL10) | 85 | #7 of 174 | ~2.51 / 2.01 MW* (design 2.51 MW, ESTIMATE) | yes | <5 MVA (unconfirmed) | ERA register |
| Muchea Industrial Park (EV-Energy, a Zenith Energy subsidiary; EDL10) | 71 | #65 of 174 | ~15.2 / 12.16 MW* (design 15.2 MW, ESTIMATE) | no (over) EV-Energy's ERA application estimates 12 MW peak across Muchea and the two Busselton estates combined (pp.5, 8): the 15.2 MW (ESTIMATE) here is the UDS design-minimum rule on 80 ha, about 4× the application's peak per ha. | 5-10 MVA (unconfirmed) | ERA register |
| Busselton Gateway Airport Industrial Park (EV-Energy, a Zenith Energy subsidiary; EDL10) | 85 | #7 of 174 | ~2.9 / 2.32 MW* (design 2.9 MW, ESTIMATE) | yes | <5 MVA (unconfirmed) | ERA register |
| Busselton Home HQ (EV-Energy, a Zenith Energy subsidiary; EDL10) | 89 | #7 of 174 | ~2.85 / 2.28 MW* (design 2.85 MW, ESTIMATE) | yes | <5 MVA (unconfirmed) | ERA register |
Rank = the position each licensed site's score would take among the 174 scored rows it is ranked against: the 173 target and estate rows on TSP 2025 that have a fit score and are not in Too big, Not a microgrid lead or Unresolved, plus the site itself. Industrial estates are sized on the next stage only and judged on connection and grid draw (* = grid draw is an assumption).
Each site is ranked separately against the pool, so sites with close scores can share a rank.
Alert sources
| Source | Data | Status | Alerts |
|---|---|---|---|
| Subdivision lodged (Landgate Plan Extent, LGATE-284): newly lodged plan numbers, checked daily. A lodged plan is not a purchase and not a connection | SLIP public Property and Planning layer 135, anonymous query; snapshot of plan numbers and reduced geometry; newest 300 deposited plans shown as recent | live (refreshed); terms of stored re-use open | 106 |
| Council rezonings: local planning scheme amendments referred to the EPA | SLIP Environment layer 114 (EPA referred schemes, DWER) | live (refreshed) | 15 |
| WAPC region scheme amendments (MRS / PRS / GBRS), advertised | SLIP Property and Planning layer 119 (DPLH-078), with the current zone from layer 48 | live (refreshed) | 4 |
| Structure plans endorsed by the WAPC | SLIP Property and Planning layer 32 (DPLH-024) | live (refreshed) | 57 |
| EPA referrals of subdivision / estate / industrial land proposals (named proponent) | SLIP Environment layer 115 (EPA referred proposals) | live (refreshed) | 0 |
| Development applications at DAPs, with the applicant team (organisations) from the minutes | DAP agendas and minutes, with the applicant team from the minutes | live (refreshed) | 87 |
| State significant development applications | planning.wa.gov.au listing | live (refreshed) | 38 |
| DevelopmentWA land releases and estate stages | DevelopmentWA news, matched to ULDO estate / suburb names | live (refreshed) | 2 |
| Clearing-permit applications for industrial development | SLIP Environment layer 49 (clearing permits). No date field | live (refreshed) | 4 |
| WAPC subdivision applications | Not public: the DPLH-087 subdivision layer is government use only; PlanningAlerts carries council referrals but needs an API key (and a paid plan for commercial use) | gap | – |
| Council DA registers and council rezoning agendas | Council DA registers have no common feed. Council consultation pages are now covered (see the consultation source), and rezonings also through the EPA referral of every scheme amendment | gap (partly covered) | – |
| Council and DPLH consultation pages (8 councils + DPLH Have Your Say) | EngagementHQ projects.json (Armadale, Serpentine-Jarrahdale, DPLH, Kwinana) and Social Pinpoint sitemap.xml (Swan, Wanneroo, Rockingham, Gosnells, Cockburn); one collector, times converted to AWST | live (refreshed) | 32 |
| WAPC Statutory Planning Committee agenda items | WAPC meetings API (type=spcpublication), first 8 pages of each agenda PDF | live (refreshed) | 11 |
| WA Government Gazette planning notices | Gazette Atom feed; PL-coded notices from the planning pages only | live (refreshed) | 14 |
| DWER clearing permits open for public comment | DWER clearing-permit applications page, joined to the SLIP clearing layer on the CPS number | degraded: the page blocks automated access, last good capture kept (19 Oct 2026) | 1 |
| EPBC referrals in WA (federal) | DCCEEW EPBC referrals ArcGIS layer, WA, housing / industrial / energy / transport categories | live (refreshed) | 0 |
| DAP current-applications register | planning.wa.gov.au current-applications PDF; merged with DAP agenda alerts on the DAP reference | live (refreshed) | 33 |
| Land deals (press) | Press reports of land sales, checked for a live link; design load and substation headroom are team calculations with the method shown | live (curated list, links checked on refresh) | 4 |
| Phase 2: Landgate daily title-transfer feed | Land Tenure (de-identified) LGATE-457 is a paid daily feed; shown as a mock-up only, no Landgate data used | phase 2 (mock-up) | 0 |
5. Value context
Not shown in this build: no monetary value figures are displayed.
6. Caveats
- NCMT bands are load headroom; for generation and storage they are a proxy only.
- Headroom is a planning forecast (PoE10), not a connection offer.
- Whether NCMT already includes Western Power's planned changes is not verified in this build; NOM projects are shown as a cross-check only, and a NOM 'Required by Date (subject to change)' is a need date, not a delivery date.
- Western Power gives connection-ready projects designated under its Critical Projects Framework (launched May 2024) 'right of way to Western Power resources'. Our assumption: projects not designated critical may wait longer than the average connection time, so our grid-ready dates may be optimistic. (Western Power, Critical Projects Framework page (checked 21 Oct 2026))
- Geocodes at locality level are coarse and cap the evidence score.
- Licences: the SLIP map services are licensed for personal, non-commercial use unless a dataset's own licence or a SLIP subscription covers it, and the DBCA wetlands (DBCA-019) and TEC (DBCA-038) layers are CC BY-NC 4.0. That is fine for this demo, but a paid product needs these licences cleared. The petroleum pipelines layer (DMIRS-007) is CC BY 4.0.
- EPA referrals do not carry MW as data: the EPA referred-proposals layer (DWER-120) has no MW, generator or emissions field. MW sometimes appears in the referral PDFs (e.g. greenhouse gas plans), so we use referrals only as a lead-finding signal, read by hand, never as an automatic MW source.
- Gas corridors are licence corridors, not supply: a tap off DBNGP or Parmelia needs the pipeline owner's agreement (DBP or APA), a gate station and a lateral, plus supply contracts, so allow about a year or more. Smaller sites would more likely use the ATCO distribution network, which is not mapped here.
7. Data freshness
| Source | Files | Last pulled (AWST) |
|---|---|---|
| AEMO WA market data | 81 | 2026-10-19T08:01 |
| AEMO outages and commissioning | 4 | 2026-10-19T08:02 |
| AEMO WEMDE prices | 149 | 2026-10-19T08:02 |
| Western Power NCMT capacity map | 13 | 2026-10-15T15:03 |
| Western Power NOM / price workbooks | 10 | 2026-10-19T14:52 |
| SLIP planning and environment layers | 28 | 2026-10-15T15:13 |
| Geoscience Australia electricity infrastructure | 3 | 2026-10-15T15:03 |
| DAP agendas and minutes | 303 | 2026-10-19T14:11 |
| Significant development (Part 11B) | 1 | 2026-10-19T08:02 |
| DevelopmentWA estates | 2 | 2026-10-19T14:12 |
| Open-Meteo weather | 16 | 2026-10-19T08:04 |
| OpenElectricity (WEM) | 53 | 2026-10-19T08:04 |
| OpenStreetMap (Overpass) | 24 | 2026-10-19T08:19 |
| Curated power figures (research) | 1 | 2026-10-15T16:58 |
| Major projects (REMP 2025) | 1 | 2026-10-15T15:03 |
| CER Safeguard 2024-25 | 1 | 2026-10-15T16:58 |
Exported 2026-10-19T22:41 AWST · refresh status ok (20261019_222234). Live WEM prices, when available, come from the host at ./api/oe/market.