10new in the last 7 days
105in severe areas (under 5 MVA in 2029)
92rezonings and structure plans (early)
7fresh early-stage leads (2 leads + 5 watch, 2 of them below 1 MW); 111developments in the grid outlook (68 likely to need their own supply (tool estimate), 43 likely to wait for Western Power (tool estimate), 0 grid likely ready in time (tool estimate), 0 not enough data); 20 unresolved; 32 not a microgrid lead
Who to ring this week
The WAPC endorsed the L877 & L878 Stakehill Rd Structure Plan (SPN/2297), about 420 homes (19 Nov 2025). The Meadow Springs zone substation (named in the plan) is over capacity in 2029 (124% of planning capacity (NCR / N-1 as applicable) in 2029 in TSP 2025; 119% in the draft TSP 2026; severe), and the landowner is not confirmed (title not checked); the planner is named in the plan, so give them a ring.
Structure plan endorsed by the WAPC<5 MVA in 20292025-11-19 ·
source The WAPC endorsed the Wandi District Centre Precinct Structure Plan (SPN/2375), about 292 homes (20 Mar 2026). The Medina zone substation (named in the plan) has 5-10 MVA spare in 2029 (constrained), and the landowner / developer is named in the plan, so give them a ring.
Structure plan endorsed by the WAPC5-10 MVA in 20292026-03-20 ·
source
Land deals (press)
Troon Group bought 201 Stock Road, Bullsbrook (180 ha) (settled (press report)) (26 Aug 2026). The 2016 South Bullsbrook LSP2 (s3.7.3, PDF p.83) plans a second 22 kV feeder from Muchea Zone Substation, then possibly Henley Brook; the current supply substation is not confirmed. The Muchea area has 5-10 MVA spare in 2029 (constrained).
press reportsettled (press report)51 MVA x (1 - 87%) = 6.6 MVA in 2029 (team calculation from TSP 2025 Appendix E utilisation)
source Birchmead (CFC Group) bought 167 Bushmead Road, Hazelmere (4.43 ha) (reported sold (press report)) (12 Aug 2026). The supply area mapped at this location (zone substation unconfirmed) has <5 MVA spare in 2029 (severe). Context only, not a call this week.
press reportreported sold (press report)2029 band at this location (zone substation unconfirmed)
source Buyer not published; reported sold (title-derived listing): Lot 821 Stirling Crescent, Hazelmere (3.067 ha); confirm via Landgate (17 Jul 2026). The supply area mapped at this location (zone substation unconfirmed) has <5 MVA spare in 2029 (severe). Context only, not a call this week.
press reportsold 17 Jul 2026 (title-derived listing; confirm via Landgate)2029 band at this location (zone substation unconfirmed)
source AIMS APAC REIT bought 398 Bushmead Road and 286 Stirling Crescent, Hazelmere (9.2 ha) (settled 5 Aug 2026 (SGX)) (9 Jul 2026). The supply area mapped at this location (zone substation unconfirmed) has <5 MVA spare in 2029 (severe). Context only, not a call this week.
press reportsettled 5 Aug 2026 (SGX)2029 band at this location (zone substation unconfirmed)
source
"Give them a ring" email template (draft, never sent)
Pre-filled for the first alert above. The BD manager edits and sends it from their own mailbox.
Subject: Power for the L877 & L878 Stakehill Rd Structure Plan without the Western Power wait
Hi [first name],
I saw the WAPC endorsement of the L877 & L878 Stakehill Rd Structure Plan (19 Nov 2025).
Western Power's planning data shows the Meadow Springs zone substation (named in the plan) over capacity in 2029 (124% of planning capacity in TSP 2025; 119% in the draft TSP 2026), so larger loads there are likely to need network augmentation and a long wait; whether yours does depends on its size against that spare capacity. An estate microgrid supplies the lots behind a single grid connection, with shared solar and batteries, which can cut the grid capacity a development needs and the time to energise lots.
Would 15 minutes next week be useful to compare a microgrid with your current power plan?
Kind regards,
[your name]
Zenith Energy
Constrained = Western Power NCMT remaining capacity of 20 MVA or less in 2029; severe = under 5 MVA (this tool's screening rule). Sweet spot = connection under 10 MW, load about 5 MW or less, grid draw about 4 MW or less, land developer.